52
PARTS REQUIRED:
x28
2" (5,1 cm)
FRONT TRIM
FINISH
Your corner trim and upper gable trim boards are now installed.
Install
VAA
corner trim flush to side corner trim
(Fig. A)
.
Secure trim with (14) 2" finish nails into wall framing. Space nails evenly.
Install (2)
ZD
trim pieces centered and flush up to soffit.
Secure trim with (14) 2" finish nails into top plate. Space nails evenly.
BEGIN
¸
1
2
CENTER
VAA
VAA
ZD
ZD
Fig. A
Flush to side
corner trim
2" Finish Nail
Flush
Flush
Flush
Flush
Flush
Flush
Flush
2" (5,1 cm)
Finish Nails
Nail into
Top Plate
x2
19/32" x 2-1/2" x 72-3/4" (1,5 x 6,3 x 184,8 cm)
x2
19/32" x 2-1/2" x 90-5/8" (1,5 x 6,3 x 230,2 cm)
Push trim up
fush to soffit
ZD
VAA