Bellerose Greenhouse
Site Location and Preparation
A.
Check your local building and city codes for permit requirements or
restrictions, including any HOA restrictions.
B.
Select a location with lots of sun, good drainage, and the ability to
create a level firm surface for your greenhouse.
•
A firm, level surface is critically important to the longevity of your
greenhouse.
•
Ensure it is accessible on all sides to clean and conduct annual
maintenance
•
Consider a site location with a close proximity to both water and
electrical sources
•
Make sure site drains well and avoid low lying areas.
C.
Before preparing your surface
–
double check for possibility of any
underground utilities (example: gas, cable, or sprinkler lines)
•
Remove any grass, dirt, landscaping to create a level, hard-packed
surface
•
This may involve some digging to create a level spot, dependent
on your site location.
D.
Determine your preferred site pad materials for your greenhouse
•
It is NOT recommended to set the greenhouse directly on soil or
grass. This will shorten the lifespan of your greenhouse.
•
Site pad options include gravel, patio or brick pavers, concrete
pad
.
•
If building on
a natural surface, such as gravel
,
see step 103.
•
If building on a concrete foundation
see
S
tep
104.
3
Summary of Contents for ZALIE 2304123
Page 7: ...7...
Page 8: ...8...
Page 9: ...9...
Page 10: ...10...
Page 11: ...11...
Page 12: ...12...
Page 13: ...13...
Page 14: ...14...
Page 15: ...15...
Page 16: ...16...
Page 17: ...17...
Page 20: ...20...
Page 21: ...21...
Page 22: ...22...
Page 23: ...23...
Page 24: ...24...
Page 25: ...25...
Page 26: ...26...
Page 27: ...27...
Page 28: ...28...
Page 29: ...29...
Page 30: ...30...
Page 31: ...31...
Page 32: ...32...
Page 33: ...33...
Page 34: ...34...
Page 35: ...35...
Page 36: ...36...
Page 37: ...37...
Page 38: ...38...
Page 39: ...39...
Page 40: ...40...
Page 41: ...41...
Page 42: ...42...
Page 43: ...43...
Page 44: ...44...
Page 45: ...45...
Page 46: ...46...
Page 47: ...47...
Page 48: ...48...
Page 49: ...49...
Page 50: ...50...
Page 51: ...51...
Page 52: ...52...
Page 53: ...53...
Page 54: ...54...
Page 55: ...55...
Page 56: ...56...
Page 57: ...57...
Page 58: ...58...
Page 59: ...59...
Page 60: ...60...
Page 61: ...61...
Page 62: ...62...
Page 63: ...63...
Page 64: ...64...
Page 65: ...65...
Page 66: ...66...
Page 67: ...67...
Page 68: ...68...
Page 69: ...69...
Page 70: ...70...
Page 71: ...71...
Page 72: ...72...
Page 73: ...73...
Page 75: ...75...
Page 76: ...76...
Page 77: ...77...
Page 78: ...78...
Page 79: ...79...
Page 80: ...80...
Page 81: ...81...
Page 82: ...82...
Page 83: ...83...
Page 84: ...84...
Page 85: ...85...
Page 86: ...86...
Page 87: ...87...
Page 88: ...88...
Page 89: ...89...
Page 90: ...90...
Page 91: ...91...
Page 92: ...92...
Page 93: ...93...
Page 94: ...94...
Page 95: ...95...
Page 96: ...96...
Page 97: ...97...
Page 98: ...98...
Page 99: ...99...
Page 100: ...100...
Page 101: ...101...
Page 102: ...102...
Page 103: ...103...
Page 104: ...104...
Page 105: ...105...
Page 106: ...106...
Page 107: ...107...
Page 108: ...108...
Page 109: ...109...
Page 110: ...110...
Page 111: ...111...
Page 112: ...112...
Page 113: ...113...
Page 114: ...114...
Page 115: ...115...
Page 116: ...116...
Page 117: ...117...
Page 118: ...118...
Page 119: ...119...
Page 120: ...120...
Page 121: ...121...
Page 122: ...122...
Page 123: ...123...
Page 124: ...124...
Page 125: ...125...
Page 126: ...126...
Page 127: ...127...
Page 128: ...128...
Page 129: ...129...
Page 130: ...130...
Page 131: ...131...
Page 132: ...132...
Page 133: ...133...
Page 134: ...134...
Page 135: ...135...
Page 136: ...136...
Page 137: ...137...
Page 138: ...138...
Page 139: ...139...
Page 140: ...140...
Page 141: ...141...
Page 142: ...142...
Page 143: ...143 ONLY USE FOR ANCHORING TO GROUND SEE STEP 104 FOR ANCHORING TO CONCRETE...
Page 144: ...144...