Fort Assembly
Phase 2
Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (3) K4 - WALL RAIL - W101093
• (1) K3 - DOUBLE ARCH RAIL - W101092
• (1) G1 - WALL RAIL - W102379
• (1) G2 - WALL RAIL - W102378
• (1) SQ - "A" REVISION TAG - A100314
Hardware needed:
• (24) Z - LAG SCREW WH 5/16x2 - H100027
• (24) AC - WASHER LOCK EXT 8x19 - H100030
• (2) - SCREW PWH 8x5/8 - H100128
Step 1: Attach 'K4' Wall Rail to the
edges of 'E1' & 'E2' Fort Uprights and
'E3' & 'E4' Fort Uprights using hardware
Lag Screw 'Z' and Lock Washer 'AC', as
shown.
K3
G2
K4
K4
G1
K4
E1
E3
E4
E2
Step 2: Attach 'G2' Wall Rail & 'K3' Double
Arch Rail to the edges of 'E1' & 'E3' Fort
Uprights using hardware Lag Screw 'Z' and
Lock Washer 'AC', as shown. Pre-drilled hole
in 'G2' wall rail is not centered, measure and
assembled as shown.
Step 3: Attach 'G1' Wall Rail
to the edges of 'E2' & 'E4'
Fort Uprights using hardware
Lag Screw 'Z' and Lock
Washer 'AC', as shown.
Note: It is vital that the fort
be level before and after
each phase of assembly.
"A" REVISION TAG
SCREW PWH 8x5/8
(2 PLCS)
LAG SCREW WH 5/16x2
(24 PLCS)
WASHER LOCK EXT 8x19
(24 PLCS)
Step 4: Attach '"A" REVISION
TAG TO E4 USING (2) 8x5/8
SCREWS APPROX 8"
(200mm) FROM BOTTOM.
34