background image

Single Beam 

Phase 4 

Step 1:  Gather assembly from phase 3 & hardware bag. 

Step 2: Slide top beam into clamp on fort and attach with 5/16"x6" carriage bolts as shown in fig. 1 below. 

Step 3: Adjust the single beam legs to make sure the top beam is level.  Legs may be taken 

in or out to adjust on uneven ground. 

Step 4: Once top beam is level, secure legs using (8) 5/16"x2 1/2" lag screws per single beam 

clamp as shown below. 

Step 5: Attach support brace  B to legs with (2) 4 1 /2" lag screws and (2) flat washers. 

Step 6:  Place double angle gussets G against beam and cross brace & attach with (4) 4 1/2" lag screws 

and 5/16" washers as shown in Fig G. 

NOTE:  Do not allow metal plate to extend 

- past the legs at minimum distance. 

Summary of Contents for Mountaineer

Page 1: ...oints Keep parts out of the reach of children until assembled Parts of this product can present dangers if improperly assembled W CAUTION The plastic bags that contain the hardware may present a choki...

Page 2: ......

Page 3: ......

Page 4: ......

Page 5: ......

Page 6: ......

Page 7: ......

Page 8: ......

Page 9: ......

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ......

Page 26: ...WS THROUGH SLIDE FLOOR SECURE WITH 2 5 16 FLAT WASHERS 2 LOCK NUTS 2016 TREEHOUSE SERIES CENTER SLIDE IN WALL OPENING POSITION BOTTOME LIP OF SLIDE FLUSH WITH EDGE OF THE FLOOR BOARD DRILL 2 3 16 PILO...

Page 27: ......

Page 28: ...Single Beam Option I INS EXPLSB 09...

Page 29: ...Single Beam 2 POSITION TOP BEAM Parts Identification 3 POSITION TOP BEAM BEAM 4X6X133 STRIP 2 3 4 X110 TOP PLATE 3 POS 4 POSITION TOP BEAM BEAM 4X6X169 STRIP 2 3 4 X132 TOP PLATE 4 POS...

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ...may be taken in or out to adjust on uneven ground Step 4 Once top beam is level secure legs using 8 5 16 x2 1 2 lag screws per single beam clamp as shown below Step 5 Attach support brace B to legs w...

Page 35: ...into ground at an angle Attach with lag screws 1 1 2 Lag Screw REBAR STAKES rr NOTE Attach stakes to 4x6 single beam legs Stakes must be located as shown Stake Stake TOP VIEW Failure to use stakes can...

Reviews: