Fort Assembly
Phase 14
Parts needed:
• (2) L6 - BAY WINDOW - W100571
• (6) N5 - BAY WINDOW- W100592
• (6) N9 - BAY WINDOW - W100596
• (3) GK - WINDOW FRAME GREEN 216x267 - A100146
Hardware needed:
• (20) BQ - SCREW PFH 8x1-1/4 - H100087
• (4) BR - SCREW PFH 8x1-1/8 - H100088
• (12) BC - SCREW PWH 8x3/4 - H100070
Phase Notes
• Assemble with hardware as shown.
Step 3: Repeat Steps 1 & 2 to finish
attaching Bay Window Frames using
the proper screws, as shown.
Step 2: Repeat Step 1 and attach
second Bay Window Frame using the
proper screws, as shown.
Step 1: Center, pre-drill and attach
'N9' Bay Window Rails to the edge of
'L6' Bay Window Rails using Screws
'BQ'. Pre-drill & attach 'N5' Bay
Window Rails to the edge of 'L6' Bay
Window Rails using Screws 'BQ', as
shown.
Step 4: Center and attach 'GK'
Window Frame Green to the outside
of the Bay Window Assembly with
Screws 'BC', as shown.
L6
L6
N5
N5
N9
N9
BQ
BQ
BQ
L6
L6
N9
N5
N5
N9
BQ
BQ
N5
N9
L6
L6
N5
N9
BR
BR
BQ
BQ
BQ
BR
BQ
BR
N5
BC
BC
BC
GK
GK
GK
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
Note: It is vital that the fort
be level before and after
each phase of assembly.