Phase 5
ǻÝƻʲ
Ǣǻrƻˠ
0
ˠ˦ˠ
ʹɮˡʺ
Dŷĵǻ˚ˠ˃
ˢ˨˧
ʹɮˡʺ
ǻ˚ŗȕǻ˚ˠˀˣ˃
ˢ˨˧
ʹɮˡʺ
ǻ˚ŗȕǻ˚ˠˀˣ˃
ˤ˥˦
ʹɮˡʺ
Dŷĵǻ˚ˡˠˀˣ˃
˧˧ˠ
ʹɮˠʺ
džȕNJǻrNJNJŷȕŗ^ǻȕNJNJrǻ®ĵŷŷNJǢȕƻƻŷNJǻ
˧˧˟
ʹɮˠʺ
ǻȕNJNJrǻɟĵĵNJNËDŗ^
ˤ˥˦
ʹɮˢʺ
Dŷĵǻ˚ˡˠˀˣ˃
ˢ˨˧
ʹɮˢʺ
ǻ˚ŗȕǻ˚ˠˀˣ˃
WE RECOMMEND INSTALLING T-NUTS
INTO BOARDS BEFORE ASSEMBLY.
TURRET WALL ARCH BAND
(x1)
A4M00880
QUARTER ROUND TURRET FLOOR SUPPORT
(x1)
A4M00881
BOLT WH BLK
1/4x2 1/4
(x5)
H100567
T-NUT BLK
1/4
(x5)
H100398
BOLT WH BLK
1/4x1
(x2)
H100171
103