Bacharach PUR-CHEK PRO Operation And Maintenance Manual Download Page 4

Pur•Chek™ Pro 

 

Operation and Maintenance Instruction Manual 

 

 

iv 

 

P/N

 

2100-9001

 Rev 2 

List of Figures 

Figure 3-1.  Base Unit Showing Key Components

 

 ....................................................................................... 5

Figure 3-2.  Low Side Vapor Sample Hose

 

 ................................................................................................... 5

Figure 3-3.  High Side Sample Hose

 

 ............................................................................................................ 6

Figure 3-4.  Control Panel Showing Key Components

 

 ................................................................................. 6

Figure 3-5.  Back Panel Connectors

 

 ............................................................................................................. 7

Figure 3-6.  Hard Shell Storage/Carrying Case

 

 ............................................................................................ 7

 

Figure 4-1.  Location of Battery Compartment Screws

 

 ................................................................................. 8

Figure 4-2.  Sample Screens Showing Start-up Sequence

 

 .......................................................................... 9

Figure 4-3.  Sample Screens Showing Calibration Testing

 

 .......................................................................... 9

Figure 4-4.  Screens Showing Sample Test Results

 

 .................................................................................. 10

Figure 4-5.  Test Results for Contaminated Blend Refrigerants

 

 ................................................................. 11

Figure 4-6.  Test Results for Pure Blend Refrigerants

 

 ................................................................................ 11

Figure 4-7.  Test Results for Blends with Incorrect Component Ratios

 

 ...................................................... 12

Figure 4-8.  Samples of Printed Test Results

 

 ............................................................................................. 12

 

Figure 5-1.  Sample Screens Used in Setting LCD Contrast

 

 ...................................................................... 13

Figure 5-2.  Screens Used in Changing Printer Paper

 

 ............................................................................... 14

Figure 5-3.  How to Change Printer Paper

 

 .................................................................................................. 15

 

 

List of Tables 

Table 1-1.

 

Pur

Chek

 Pro Kit Part Number

 

 ............................................................................................... 3

Table 1-2.

 

Pur

Chek

 Pro Kit Replacement Part Numbers

 

 ....................................................................... 3

 

Table 2-1.

 

Specifications

 

............................................................................................................................. 4

 

 
 
 
 
 
 
 

Summary of Contents for PUR-CHEK PRO

Page 1: ...Product Leadership Training Service Reliability Operation and Maintenance Instruction Manual 2100 9001 Rev 2 October 2011...

Page 2: ...E EXCLUSIVE AND ARE GIVEN AND ACCEPTED IN LIEU OF I ANY AND ALL OTHER WARRANTIES EXPRESS OR IMPLIED INCLUDING WITHOUT LIMITATION THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR...

Page 3: ...4 Control Panel 6 3 5 AC Power Adapter 6 3 6 Back Panel Connections 7 3 7 Hard Shell Storage Carrying Case 7 4 Operation 8 4 1 Battery Installation 8 4 2 Turning On The Unit 8 4 3 Calibration 9 4 4 V...

Page 4: ...p Sequence 9 Figure 4 3 Sample Screens Showing Calibration Testing 9 Figure 4 4 Screens Showing Sample Test Results 10 Figure 4 5 Test Results for Contaminated Blend Refrigerants 11 Figure 4 6 Test Re...

Page 5: ...oderate injury IMPORTANT The use of the word IMPORTANT in this manual calls attention to a procedure practice or condition which if not correctly performed or adhered to could result in incorrect perf...

Page 6: ...rors into the refrigerant analysis and instrument calibration ALWAYS verify that the refrigerant to be tested from the Low Side does not contain or will not emit heavy loads of oil or liquid NEVER adm...

Page 7: ...pressure liquid sampling hose assembly 2100 0010 Spare low pressure sample hose filter restrictor 2100 0012 Spare rechargeable battery optional 1 7 Functional Overview Contamination of refrigerants ei...

Page 8: ...r Chek Pro provides the refrigerant technician with refrigerant type refrigerant purity refrigerant contamination information potential flammability information 2 Specifications Table 2 1 Specificatio...

Page 9: ...on of harmful oil into the machine The maximum inlet pressure is 500 psig The hose is provided with an instrument inlet port mating connector on one end and a 1 4 SAE female flare coupling nut on the...

Page 10: ...green LEDs at the top of the control panel are used for visual status indications Refer to Figure 3 4 Figure 3 4 Control Panel Showing Key Components 3 5 AC Power Adapter The Pur Chek Pro is powered...

Page 11: ...clear at all times Do not operate near open flame Figure 3 6 Back Panel Connectors 3 7 Hard Shell Storage Carrying Case The hard shell storage carrying case is custom fit to the Pur Chek Pro It provid...

Page 12: ...side Slide the nylon strap around the battery Insert the battery module into the compartment aligning the female connector of the battery module with the male plug in the battery compartment Replace...

Page 13: ...2D and Figure 4 2E When calibrating the unit will bring fresh air into the unit via an internal pump This fresh air purges any excess refrigerant and ensures accurate test results Calibration require...

Page 14: ...to the instrument and the opposite end of the liquid sampling assembly to the High Side Liquid port of the system or cylinder Affix the oil trap syringe vertically to the tank with the magnet 3 Open...

Page 15: ...rants R408A R409A R417A R421A R421B R422A R422B R422C and R427A In addition the instrument can both Identify and Analyze the component content of pure R134a R22 R404A R407C and R410A Analysis of analy...

Page 16: ...us screen Additional printouts may be made following the same procedure To exit the test press the EXIT button Figure 4 8A Figure 4 8B and Figure 4 8C show sample printouts for various test results NO...

Page 17: ...d spots or discolorations are discovered on the outside diameter the sample filter requires replacement to prevent the influx of particulate and oil mists into the instrument To replace the white plas...

Page 18: ...DO NOT soak the parts for more than 60 seconds 5 Allow coupler parts to dry Check coupler parts for oil once again Failure to clean the oil out of the coupler will result in premature clogging of the...

Page 19: ...ed to the factory for new gas calibrations The Pur Chek Pro has a USB update port located within the battery compartment This port should not be used for any other purpose other than to install factor...

Page 20: ...ual 16 P N 2100 9001 Rev 2 Headquarters 621 Hunt Valley Circle New Kensington PA 15068 Ph 724 334 5000 Fax 724 334 5001 Toll Free 800 736 4666 Website www mybacharach com E mail help mybacharach com P...

Reviews: