background image

Locations for Checking Draft

Furnace manufacturer may require measurement of draft (a) in 

fl

 ue between regulator and furnace or (b) over

fi

 re between com-

bustion space and heat exchanger (Figure 4). Locate sampling 

hole in 

fl

 ue 6” or more from draft regulator or damper toward 

furnace. Use awl with ¼ shank for forming draft hole in light 

sheet metal. Make over

fi

 re measurement through blot hole in 

door or through air louvers. If necessary, drill ¼ hole. In case of 

over sized hole or masonry setting, draft tube (replace with 

1/8’ pipe if necessary) should be inserted several inches beyond 

inside surface of 

fl

 ue pipe or furnace wall. For detailed instruc-

tions on check locations, see manufacturer’s service or installa-

tion manual.

6

Figure 3. Mounting Draft Gauge

 

Figure 4. Draft Gauge Locations

 

Measuring Draft

Allow furnace to operate for several minutes, unwrap hose, place 

gauge on reasonably level surface, check zero, insert metal draft 

tube through draft hole. After about 30 seconds read draft from 

gauge scale.

Correct Draft

Recommendations for draft required for good performance must 

be obtained from the heating equipment manufacturer’s instal-

lation or service manual. Some common causes of poor draft are 

shown in “Common Chimney Troubles”.

Maintenance

Do not oil this gauge. Protect the gauge from shock, vibration 

and exposure to excessively high temperatures.  

 

 

   

 7

Reviews: