TrilliumSeries™ Adiabatic
Cooler - TRF Rigging & Assembly Instructions
–
Rigging
Page | 9
Rigging
Refer to
for the model number specific rigging drawing. Refer to the appropriate rigging drawing for model number
specific rigging dimensions.
Model Number
# of
Fans
Rigging Drawing
Page #
TRF-1010N-C80GX17E
4
16
TRF-1014N-C80GX26E
6
17
TRF-1018N-C80GX34E
8
18
TRF-1022N-C80GX43E
10
19
TRF-1026N-C80GX51E
12
20
TRF-1030N-C80GX60E
14
21
TRF-1034N-C80GX68E
16
22
TRF-1038N-C80GX77E
18
23
Table 1. Rigging Drawing Page Numbers
Prolonged Outdoor Storage
The
TrilliumSeries™
adiabatic cooler is shipped wrapped. If the unit is going to remain in outdoor storage in excess of three
months prior to installation, remove the stretch-wrap and tarp, and follow the storage recommendations below.
NOTICE:
BAC units are typically installed immediately after shipment, and many operate year-
round. However, if the unit is to be stored for a prolonged period of time either before or after
installation, certain precautions should be observed.
Storage Preparation
•
Ensure that the sump is fully drained. Ensure the sump drain valve remains open. Remove any leaves or debris that may
have accumulated in the sump and water channels.
•
Coils must be empty and closed off. For extended shutdown periods after start-up, coils should be charged with nitrogen
at 15 psig in the field and capped by adding a welded cap. Upon start-up, the coil connections will require cutting.
•
Insert desiccant bags into the control panel to absorb moisture. Seal the control panel for storage.
•
Inspect the protective finish on the unit. Clean as required.
NOTICE:
Do not use steam, high-pressure water, or high-pressure air to clean any component.