About Rigging and Installation
The BAC equipment should be rigged and installed as outlined in this bulletin.
These procedures should be thoroughly reviewed prior to the rigging and operation to acquaint all personnel with
the procedures to be followed and to assure that all necessary equipment will be available at the jobsite.
Be sure to have a copy of the unit certified drawing available for reference. If you do not have a copy of this drawing
or if you need additional information about this unit, contact the local BAC Balticare representative. His name and
phone number can be found on the BAC website: www.BaltimoreAircoil.eu. The model type and serial number of
your equipment are indicated on the unit nameplate.
Recommended Maintenance and
Monitoring Programme
Checks and Adjustments
Start-Up
Weekly
Monthly
Quarterly
Every 6
Months
Annually
Shutdown
Hot water basin
X
X
Nozzles
X
X
Cold Water Basin and Basin Strainers
X
X
Operating level and make-up
X
X
Blow down
X
X
Sump heater Package
X
X
Belt tension
X
X
Drive alignment
X
X
Drive System
X
X
Locking Collar
X
Rotation of fan(s) and pump(s)
X
Motor voltage and current
X
X
Unusual noise and/or vibration
X
X
Inspections and Monitoring
Start-
Up
Weekly
Monthly
Quarterly
Every 6
Months
Annually
Shutdown
General condition
X
X
Heat transfer section and drift eliminators
X
X
Combined Inlet Shields
X
X
Hot Water Basin
X
X
Spray Nozzles
X
X
Fan shaft & Axial Fan
X
X
Fan Motor
X
X
Electric Water Level Control Package (option)
X
X
TAB test (dip slides)
X
X
Circulating water quality
X
X
W W W . B A L T I M O R E A I R C O I L . E U
2
Summary of Contents for S1500E
Page 22: ...W W W B A L T I M O R E A I R C O I L E U 22...
Page 23: ...W W W B A L T I M O R E A I R C O I L E U...
Page 24: ...W W W B A L T I M O R E A I R C O I L E U...
Page 25: ...W W W B A L T I M O R E A I R C O I L E U...
Page 26: ...W W W B A L T I M O R E A I R C O I L E U...