7 |
P a g e
Step 5
ƚƚĂĐŚƚŚĞďŽƚƚŽŵ
ďĂƌ;ϭϮͿƵŶĚĞƌŶĞĂƚŚ
ƚŚĞĐŽƚͬďĞĚ͕ŽŶƚŽ
ďŽƚŚĞŶĚƐǁŝƚŚ;Ϳ
ďŽůƚƐϮϱŵŵůĞŶŐƚŚ͘
E^hZ/E^d>>;ϭϮͿ
ƚŽǁĂƌĚĨƌŽŶƚŽĨĐŽƚͬ
ďĞĚĂŶĚƵŶĚĞƌ
ĚƌŽƉƐŝĚĞͬĨƌŽŶƚŽĨ
ĚƌĂǁĞƌ
12
c
c
Step 6
Connect
fi
xed side to
ends by passing (D)
bolts 55mm through
pre-drilled hole onto
side of cot end.
D / Bolts 55mm x 4
C / Bolts 25mm x 2
c