Roof Hatch, Smoke Vent and Floor Door Safety Railings 

Installation, Operation & Maintenance 

  Model(s): BSRA/BSRV/BSRT

 

Railing: Top and Mid Rails (

figure 5)

 

Before installation, note the position of the door. The top and mid-
rails should be placed opposite the hinge side of the roof hatch or 
floor door to protect the opening. 

1. Assemble the appropriate fittings with the horizontal rails

 

and tighten the set screws using the provided 3/16

"

 Allen

 

wrench.

2. Slide the horizontal mid rails over the upright posts.
3. If necessary, install collar fitting over upright post that will

not have an elbow. 

4. Install the top rails over the upright posts and tighten the set screws.
5. Position the mid-rail 21

"

, center-to-center, from the top rail.

6. If necessary, install end cap on single upright post.

Exit Option – Self-Closing Gate, 

figure 6 

This option is intended for roof hatch and floor door applications. 

1. Railing packages include a chain. If installing a gate, the chain is
not used. 
2. Remove provided hardware pouch attached to the safety gate.
3. Install safety gate using two U-bolt mounting brackets on
applicable upright post, 

figure 7

4. Set the safety gate to the height of the top safety rail and
temporarily tighten using the provided hardware. 

5. Rotate gate hinges so the gate stop contacts the opposing upright post.
6. Tighten U-bolt on the hinge to 20 ft/lbs.
7. Test the full range of gate operation to ensure the gate automatically

closes when opened fully.

Figure 7 

U-bolt 

mounting 

brackets (2) 

Figure 6 

Figure 5 

Summary of Contents for BSRCAY

Page 1: ...s and materials for missing or damaged components and hardware o Railings may ship in multiple boxes depending on its size and exit configuration To help keep systems together the boxes will come banded together that form a full system o Material must be stored in a clean dry location Tools o Level o Marking Tool o Drill o 1 2 inch Drill Bit o Caulking o 3 16 inch Allen Wrench included o 1 2 inch ...

Page 2: ...n each corner and drill 1 2 diameter holes Remove 3 8 16 nut and bolt 20 30 from the bracket halves 10 5 Fasten to the corner on counterflashing using 3 8 16 x 3 4 bolts 30 washers 40 and threaded nut plate 50 which is placed behind the counterflash for quick easy installation a If mounting holes were drilled apply roofer s caulk around hole in counterflashing b Align and hold the threaded nut pla...

Page 3: ...nter post Temporarily attach it to corner posts to verify location of center post bracket 3 Assure that the bracket is sitting square and level on the counter flashing 4 Mark the mounting holes on the counter flash and drill 1 2 diameter holes Remove 3 8 16 nut and bolt from bracket halves and top rail assembly 5 Fasten to the center of the counter flashing using 3 8 16 x 3 4 bolts washers and thr...

Page 4: ... and tighten the set screws 5 Position the mid rail 21 center to center from the top rail 6 If necessary install end cap on single upright post Exit Option Self Closing Gate figure 6 This option is intended for roof hatch and floor door applications 1 Railing packages include a chain If installing a gate the chain is not used 2 Remove provided hardware pouch attached to the safety gate 3 Install s...

Page 5: ... Two and Four Sided Rails This option is intended for smoke vents and equipment roof hatches when there is no required exit OPERATION Assure that all fasteners are tightened to the suggested torque The gate should fully open and close with no interference The roof hatch should operate without interfering with the safety railing MAINTENANCE o It is recommended that the springs in gate be lubricated...

Reviews: