![background image](http://html1.mh-extra.com/html/babboe/city/city_assembly-manual_3159837023.webp)
22
STEP 9.4
Mounting the side panels
Overview
The contents of the sachets labeled D, E and F are required for the assembly
of sides of the cargo box. Before following the step-by-step instructions, first
look at the overview below. The letters correspond to the sachets.
IMPORTANT:
When constructing the cargo box, the nuts and
bolts must be screwed in, but not too tightly. The leeway is
necessary for the installation of the cargo box onto the bottom
panel. Once the cargo box has been installed onto the frame, the
connections can be tightly secured with hand tools.
!
Parts and tools required:
- 2 side panels
- 4 attachment profiles
- Sachets D, E & F
- Phillips screwdriver
- Ring/open-ended
spanner #10