Installation Manual
Commissioning
FLAT
TOUCH
BAB
TECHNOLOGIE 9
3
COMMISSIONING
The
FLAT
TOUCH is delivered fully installed. This means that the operating system is pre-installed including
all necessary drivers and plug-ins and is ready for operation.
Tip:
A (USB) keyboard and a (USB) computer mouse are helpful for commissioning the
FLAT
TOUCH.
3.1
CONNECT THE FLATTOUCH
The
FLAT
TOUCH requires the supplied power supply (mains adapter) and network connection for
operation. The network cable is connected directly to a router or switch to which the visualization server
is also connected.
All connections are located under a cover that is secured with two Phillips screws. The screws are on both
sides on the bottom of the
FLAT
TOUCH.
Note:
On the
FLAT
TOUCH 10.1", the two Phillips screws are on the back of the
FLAT
TOUCH and are covered
with rubber covers!
Figure 2 Connections of the
FLAT
TOUCH
(15.6”)
•
Orange arrow: The four-pole connection for the power supply (DC IN).
•
Green arrow: RJ-45 socket (network connection). The network cable is connected here
•
Red arrow: 4* USB ports, e.g. to connect a keyboard and mouse for commissioning
•
Blue arrow: button to switch on the
FLAT
TOUCH