2. Press to power on.
3. Press to set up IDT.
4. Press START to cure.
5.3 Basic Operation
•
Duty Cycle
Duty cycle is the ratio between pulse duration and the period (the picture
below shows the difference between each cycle). Depending on the
shrinking rate of the material, operator can set the duty cycle from level1
(10%) to level 10 (100%).
Suggestion: When curing small and/or thin material, lower the duty cycle
level to reduce the shrinkage and deformation rate.
•
Curing Time
Set the time between 5 seconds – 9:55 minutes with 5-second intervals, and
set the time between 10 minutes – 30 minutes with 1-minute intervals.
1. Turn on the Power Switch.
9