10
WALL
Centre of
screen
marked
on wall
Centre lines aligned
when fixed to wall
(T
op of r
ail t
o t
op of r
ail)
Scr
een heigh
t +1mm
Centre of rail
INSTALLING THE MOUNT
i. Determine the centre of the first screen at the bottom left. Mark the centre, for the centre of the rail.
A2
158mm
WALL
A3
ii.
ii. Mark and drill two fixing holes for each
item A1
assembled.
Insert
item A3
and the top
item A2
.
Do not fully tighten
-
Allow a gap (approx.10mm).
iii. Hook
item A1
on to
item A2
using the keyholes.
Once the rail is hooked on, fasten
item A2
into the
bottom holes and tighten all fixings.
iv. Fit
item B2
to the ends of
item B1
.
WALL
LEVEL
W
ALL
10mm
A1
B1
A2
2.
B2
10mm Masonry bit
Summary of Contents for SYSTEM X BT8340
Page 3: ......