background image

I N S - S G 5 F B - H D   - E N   I n s t r u c t i o n   G u i d e  

 

P a g e  

5 | 6

 

 
4.5 Secure the G5 front bumper [P1] with four (4) 3/16” rivets [P4] using a hand riveter. 

 

 

4.6 Meter in place the bracket for the muffler temperature switch.

 

 
4.7 Tighten to the specified torque two (2) M6 self-locking nuts [P2], 

 

 

TORQUE 

LOCK NUT [P2] 

10 N•m ± 2 N•m 

 
 
 
 
 
 

Reviews: