![background image](http://html1.mh-extra.com/html/b-k-lighting/precision2-dr2-series/precision2-dr2-series_installation-instructions_460957002.webp)
RELEASE DATE
12-9-16
REFERENCE
NUMBER
INS-1367-00
40429 Brickyard Drive • Madera, CA 93636 • USA
559.438.5800 • FAX 559.438.5900
www.bklighting.com • [email protected]
B-K LIGHTING
Threaded Entry
Side Flats
1. Connect branch conduit connectors (By Others)
to the junction box using either the threaded
conduit entries on the bottom of the junction
box or through holes drilled into the sides of the
junction box.
2. Place housing in hole. Align junction box in the
path of the conduit trench.
3. Align holes to final installation orientation. Point
arrows on temporary cover toward surface to
be illuminated.
NOTE: Do not remove temporary cover until
installation of faceplate.
Flush with finished grade
5. Raise housing on EMT so housing is flush with
finished grade. Use a level to aid in leveling
housing.
6. When housing is level, tighten screws on
Patented Stability Flange™ to secure housing to
EMT. Remove excess EMT as needed.
Housing
4. Insert (4) pieces of ½” EMT conduit through
the Patented Stability Flange™. Hammer into
substrate until secure.
Leave sufficient clearance to elevate housing
to finished grade.
IMPORTANT SAFETY INFORMATION LISTED ON REVERSE
READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS
PROJECT:
TYPE:
DR
2
SERIES
Deep Housing - Metal Halide (T6)
Remote Ballast Installation Instructions
Soil Prep
Conduit
trench
18”
Dia.
A. Determine Soil Type by referencing DIG-IT
Guide.
B. Dig hole 18” wide and 24” deep.
Conduit
Trench
Excavated
for Housing
C. Prep soil according to DIG-IT Guide.