Installation Instructions
40429 Brickyard Drive • Madera, CA 93636 • USA
559.438.5800 • FAX 559.438.5900
www.bklighting.com • [email protected]
B-K LIGHTING
IMPORTANT SAFETY INFORMATION LISTED ON REVERSE
READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS
RELEASED
5-17-16
REFERENCE
NUMBER
INS-2505-00
Installation
1. Remove canopy and/or fixture from MB2 housing.
Ensure unused tapped holes are plugged to
maintain seal. Plugs are provided.
5. Place wire connectors and/or power supply
inside MB2 box, then secure canopy and/or
fixture to MB2.
4. Run conduit (By Others) to MB2 box location.
Pull wiring to MB2 box location. Use waterproof
wire connectors (By Others) to connect incoming
primary wiring to power supply. Connect incoming
ground wiring to ground conductor in housing.
See
wiring diagram.
WIRING DIAGRAM
LINE
(+)
FIXTURE
COM
WIRING DIAGRAM
POWER
SUPPLY
(-)
GROUND
GROUND
MB2
Standard Installation
2. To prepare MB2 for mounting, align
mounting brackets on back of box. Brackets
can be aligned to vertical, horizontal or 45°
orientation. Secure with mounting screw
using screwdriver.
3. Mount MB2 box to surface using mounting
hardware (Provided) using the mounting
brackets attached to back of MB2 box.
Alternative mounting methods may
compromise integrity of MB2 against water
intrusion and will void warranty.
NOTE: Surface conduit is a common entrance
for water if not properly sealed. Seal connector
threads and conduit with a suitable sealant
(Teflon tape, adhesive, etc.). Sealing the conduit
after knockouts are removed is required to
maintain warranty.