![background image](http://html1.mh-extra.com/html/b-k-lighting/hume/hume_standard-installation_3095736002.webp)
4. Align holes to final installation orientation.
Arrows on temporary cover point towards
screw location on faceplate for alignment
purposes.
NOTE: Do not remove temporary cover until
installation of faceplate.
5” O.D.
5-1/2” O.D.
1. Drill 6” diameter hole into mounting surface
at uplight installation location as per lighting
plan. Do not exceed surface diameter,
installation relies on surface mount collar
resting on surface grade. Collar diameter is 6”.
Surface mount flange is 6-1/2” diameter
Pull primary branch circuit wiring.
2. Loop minimum of 6” of wiring inside housing
to allow for fixture service.
NOTE:
Do not remove temporary cover!
Screws on faceplate will
align with alignment
arrows on temporary
cover
3. Place housing into hole. Surface mount collar
should rest on finished surface grade.
NOTE:
Do not remove temporary cover!
5. Use a silicone based sealant (not included)
between fixture and mounting surface.
RELEASE DATE
08/16/2022
REFERENCE NUMBER
INS-2873-00
40429 Brickyard Drive • Madera, CA 93636 • USA
559.438.5800 • FAX 559.438.5900
www.bklighting.com • [email protected]
B-K LIGHTING
IMPORTANT SAFETY INFORMATION LISTED ON REVERSE
READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS
HUME
UPLIGHT - INTEGRAL
Standard Installation - Surface Mount Installation
(Wood, Stone, and other Hardscapes)