
19
Fig. 5: Space in front of connectors
We recommend using the switch panel’s earth-bonding distribution frame for grounding the router’s
power supply, data cables and antenna.
Removing from DIN rail
Fig. 6: DIN rail clip
This is the default position of the DIN rail clip. To remove the router from the DIN rail, push the
router up slightly, so that the top part of the clip disengages, and then gently slide the router off the
DUIN rail.
Summary of Contents for Spectre
Page 1: ...1 SPECTRE Router USER MANUAL ...
Page 16: ...16 3 5 DIMENSIONS Basic dimensions metal box Fig 2 Basic dimensions metal box ...
Page 20: ...20 Fig 7 Removing the router ...
Page 22: ...22 Fig 9 Front panel SPECTRE with Wi Fi ...
Page 32: ...32 Fig 23 Jumper Position for external power supply Fig 24 Jumper position for RS 485 ...
Page 33: ...33 Fig 25 Jumper position for internal power supply Fig 26 Jumper position for RS 422 ...