Operating Instructions BA ULTIMATE
7 Conditioning
65 56 067 D3560
.
201.09.03.02
37
1. Brush the turbine under running water (< 38 °C, < 100 °F, at least
drinking water quality) and good lighting (min. 500 lux) and color
rendering index (min. 80 Ra) until no more dirt can be seen, for at
least 10 seconds.
2. Flush the drive channels with spray.
3. Clean and disinfect spray channels with suitable agents and
adapters according to manufacturer's instructions, e.g. with WL
Clean made by ALPRO
®
.
4. Blow spray channels with suitable adapters out with 2.5 - 3 bar until
no more moisture displaces, but at least 10 seconds. You can use
e.g. WL-dry made by ALPRO
®
.
5. Conduct thermal disinfection or unwrapped steam sterilization.
6. Maintain mechanical parts manually [ → 38].
7. Maintain the push button chuck manually [ → 41].
8. Pack the turbine in packaging material suitable for sterilization and
storage. e.g. paper/plastic composite packaging.
9. Conduct sterilization [ → 44].
6556067_EN.book Seite 37 Montag, 27. November 2017 12:27 12