Aztec 902-764 Handbook Download Page 5

902-764 Three Panel Aztec Climber 

Designed for ages 5-12 

Page 

5

 

  Rev. 04/9/2010 

SportsPlay Equipment, Inc.,  5642 Natural Bridge, St. Louis, MO 63120   (314) 389-4140 

www.sportsplayinc.com 

 
GENERAL MAINTENANCE INSTRUCTIONS: 

 

 

Check MONTHLY for loose bolts, damaged or broken parts.  Tighten and/or 
replace immediately. Replace any parts that show a reduction of 25% 
from the original size. 
 

 
GENERAL ASSEMBLY INSTRUCTIONS: 

 
Check all the parts and hardware with the packing list to be sure you 
have received everything needed to assemble this product.  CONTACT YOUR 
LOCAL DISTRIBUTOR WITH NOTIFICATION OF ANY MISSING OR DAMAGED PARTS.  
Contact must be made within ten days of receipt of your order. 
Only hand-tighten nuts & bolts on initial assembly.  Final tightening 
should be done EVENLY after final assembly when unit has been plumbed & 
leveled.   
After assembly is complete, ANY ENDS OF BOLTS PROTRUDING BEYOND NUTS 
SHOULD BE CUT OFF AND/OR PEENED OVER TO REMOVE ANY SHARP EDGES.  Go 
over entire unit to file smooth any sharp edges or projections that may 
have been caused by rough handling in shipping or installation.  

 
ASSEMBLY AND INSTALLATION: 

 

 

NOTE: 

All threaded ends of bolts protruding beyond nuts must be cut off 
and/or peened to eliminate sharp edges.  No more than two threads 
should extend beyond face of nut. All washers, “T” nuts, and 
other fastener hardware used on round pipe or tubing must be 
hammered down to conform to the curved underlying surface to 
eliminate catch points. All Bolts must be covered with Bolt Caps 
and Covers 
 

 

STEP #1:  Using Footing Diagram as a guide, mark and dig footing holes. 

Footing holes are to be 1’-6” deep (6” of dry concrete at the 
bottom of the hole allowing 12 inches of the post to be put into 
the hole), depending upon amount of resilient safety surfacing 
used, local climate and soil structure, and topography of land.   
 
Note: The slanted tabs on the ground anchor should slant in 
towards the center post. 
 

STEP #2:  Attach the Aztec Plastic Panel to the Aztec Panel Ground Anchor 

by placing the Plastic Panels over the tabs of Ground Anchors.  

Note

The King Figure must be on the lower left. 

 
 
 
 
 
 
 
 
 
 

 

 

NOTE:

 King figure 

should face away 
from center post and 
at lower left corner by 
ground anchor.  

Summary of Contents for 902-764

Page 1: ...improperly maintained can cause serious injury Periodical inspections maintenance repair and or replacement of damaged parts is necessary for safe operation of equipment Appropriate publications avail...

Page 2: ...ications for pipe sizes up to 4 1 2 diameter Varying soil climatic conditions may require deeper and heavier footings in some areas Check local building codes Detail Detail Permanent Installation Sugg...

Page 3: ...902 764 Three Panel Aztec Climber Designed for ages 5 12 Page 3 Rev 04 9 2010 SportsPlay Equipment Inc 5642 Natural Bridge St Louis MO 63120 314 389 4140 www sportsplayinc com FOOTING LAYOUT...

Page 4: ...902 764 Three Panel Aztec Climber Designed for ages 5 12 Page 4 Rev 04 9 2010 SportsPlay Equipment Inc 5642 Natural Bridge St Louis MO 63120 314 389 4140 www sportsplayinc com USE AREA...

Page 5: ...sharp edges or projections that may have been caused by rough handling in shipping or installation ASSEMBLY AND INSTALLATION NOTE All threaded ends of bolts protruding beyond nuts must be cut off and...

Page 6: ...ing at the bottom of this page for bolt configuration Fasten by placing a washer and nut in a second bolt cap and securing to the bolt from the opposite side STEP 4 Repeat Steps 1 and 2 with other 2 G...

Page 7: ...e with a slight dome at the top to help keep water away from the post Wait 48 hours before removing the braces Install resilient safety surfacing STEP 8 Attach Warning Label and Manufacturer s Identif...