background image

                                            

Technical Principles   

 

 

1ª    review – UK      06 – 2019

 

22

6.  

CLEANING AND MAINTENANCE 

 

Daily 

 

Solid waste bucket

. Empty the coffee residues and rinse with clean water. 

 

Liquid collector tray

. Clean with a water and dish washing liquid solution. 

 

Beaters

.  Carry  out  various  auto-cleaning  operations  by  pressing  button  “B”  on  the 

programming handset. 

 

Weekly 

 

Infusion  group

.  Remove  it  from  the  machine  and  rinse  it  under  a  tap  to  remove 

coffee particles. Before replacing the group, dry it with a cloth. 

 

Beaters

. Remove the beaters, the outlet tubes and the chamber from the machine, 

and  clean  everything  with  a  water  and  dish  washing  liquid  solution.  If  necessary, 

only use a soft cloth to clean so as not to scratch their surfaces. 

 

three monthly 

 

Product  hoppers

.  Remove  them  from  the  machine  and  empty  them.  Clean  them 

with  water  and  dish  washing  liquid  solution.  Dry  them  before  replacing  into  the 

machine. Clean the supports where the hoppers are fitted. 

 

Coffee bean hopper

. Carry out the same as with the product hoppers. 

 

Depending on the use of the machine

 

 

Piston  filter

.  Every  15,000  services,  it  is  recommended  to  remove  and  clean  it.  If 

necessary, it can be cleaned with a non metallic brush. If the holes are blocked, do 

not  introduce  sharp  objects  into  the  holes  to  clean  them.  It  is  recommended  to 

replace the filter with a new one when is becomes blocked. 

 

Infusion group filter

. Clean the infusion group filter at the same time as you clean 

the  piston  filter.  To  remove  the  filter  without  damaging  it,  follow  the  guidelines 

below:  Move  the  group  to  the  coffee  cake  extraction  position.  Hold  the  group  and 

the lever with one hand while loosening the filter screw with the other. On replacing 

the screw it is recommended to use Loctite 243 or a similar product to keep it tight. 

 

Piston seal

. Replace every 30,000 services 

 

Group  seals

.  Replace  every  60,000  services.  To  get  to  these  it  is  necessary  to 

remove the group filter. They are reachable by following the explanation below.  

 

Summary of Contents for VITRO S-1

Page 1: ...Technical information VITRO S1 Avda San Silvestre s n 31350 Peralta Navarra Spain Tel 34 948 709 709 Cliente azkoyenvending es...

Page 2: ...DESCRIPTION OF COMPONENTS 2 1 PRINCIPAL COMPONENTS 2 2 HYDRAULIC CIRCUIT 3 INSTALLATION AND SWITCHING ON 3 1 INSTALLATION 3 2 WATER CONNECTION 3 3 ELECTRIC CONNECTION AND START UP 3 4 FILLING CANISTER...

Page 3: ...llowing conditions 7 g of ground coffee The temperature of the infusion water between 92 C and 96 C The water pressure at 8 kg cm La presi n del agua de erogaci n a 9 kg cm The infusion time of the co...

Page 4: ...n it is ordered Characteristics of each machine model Model Coffee beans Instant coffee Decaffeinated Chocolate Milk Hot water S1 Espresso Yes Yes S1 Espresso 2 Yes Yes Yes Yes S1 Instant Yes Yes Yes...

Page 5: ...Technical Principles 1 review UK 06 2019 5 2 DESCRIPTION OF COMPONENTS 2 1 MAIN COMPONENTS...

Page 6: ...imate weight of the product is Capacity in grams Product Vitro espresso Espresso 2 Instant coffee 400 Decaffeinatted 400 Milk 600 600 Chocolate 800 800 A3 Product extractor This motor will move the sp...

Page 7: ...hown in the pictures next to this text As shown in the pictures grey inside base must be moved to the motor If not the base will be in friction provoking a break in the motor The tool reference 100401...

Page 8: ...offee granulometry but also on ground coffee Flow Remember that grinder is controlled by time 3 seconds of coarse coffee will make more grams than 3 seconds of thin coffee It can be said that turning...

Page 9: ...t in its place and fix its two anchor levers the engine of the group will position it correctly C1 Piston C2 Group C3 Filter C4 Holding handle C5 Position microswitch C6 group movement handle C7 Group...

Page 10: ...litres It is at atmospheric pressure and temperature From this deposit is taken the water to elaborate the espresso coffee and instant beverages If you wish to connect the machine to the mains water...

Page 11: ...the by pass opens allowing a small amount of water to return sufficient to prevent the water pressure from going over the 9 Kg cm The by pass is a small hole covered with a ball that is held in place...

Page 12: ...ts one through a 3 way EV for the elaboration of espresso coffee This EV has an outlet from the boiler another goes to the infusion element and the third that at rest allows the infusion element to be...

Page 13: ...ure of EV 14 Kg cm Working temperature of EV 10 C a 140 C Temperature control of the water in the boiler is done with a PTC100 Default Temperature from factory is programmed to 85 C it can be programm...

Page 14: ...69 57 169 94 170 31 170 68 171 05 171 42 171 79 190 172 16 172 53 172 90 173 26 173 63 174 00 174 37 174 74 175 10 175 47 200 175 84 176 21 176 57 176 94 177 31 177 68 178 04 178 41 178 78 179 14 210...

Page 15: ...former technical characteristics Primary 230 Vca Secondary blue blue 24 Vca Power 88 VA A14 Display All Vitro S1 range machines come with a LCD display blue colour 2 lines with 16 characters each It i...

Page 16: ...tions Select here the ones you wish t osee in operators menu First 4 selection buttons are used to navigate in the programming functions see in programming manual 2 2 Hydraulic circuit In the followin...

Page 17: ...e mains supply must provide drinking water at a minimum of 5 litres minute and a pressure of between 0 5 and 10 kg cm Following low voltage safety requirements the water connection and the socket must...

Page 18: ...ly a small quantity of product is served 1 coffee beans hopper 2 soluble product hoppers 1 2 Now the machine can be switched on 3 5 Filling the hot water boiler Start the machine and hot water boiler...

Page 19: ...Remove the waste tray clean it and refit it LONG DISTRIBUTION Adjust the grinding time to coarser Clean the group showers Check that there is voltage to the input solenoid RESIST FAULTY Element broken...

Page 20: ...n doser is activated Grinder Meassured in the control board in the conector jp10 Between pins 4 and 7 will be 220 Vca when grinder is working Transformer Meassured in the control board in the conector...

Page 21: ...ed in the control board in the conector jp1 Between pins 4 and 9 will be 0 Vcc when tray is in position Between pins 4 and 9 will be 5 Vcc when tray is not in its in position Floater microswitch with...

Page 22: ...ine Clean the supports where the hoppers are fitted Coffee bean hopper Carry out the same as with the product hoppers Depending on the use of the machine Piston filter Every 15 000 services it is reco...

Page 23: ...oup it is recommended to support with a screwdriver the shower filter at the same time 2 Push the shaft from the bottom and remove the filter holder 3 Press on the clips one on each side shown in the...

Page 24: ...compatibility The mains connection cable has an earth wire as established in the electrical safety norm The boiler has a temperature sensor that controls the connection and disconnection of the heati...

Page 25: ...1 review UK 06 2019 25 8 VOLUM TRIC DIMENSIONS Measurements in mm and weight in Kg Model width height depth weight Vitro S1 Se 305 X 590 Y 410 Z 25 3 kg Vitro S1 Se 2 305 590 410 27 2 kg Vitro S1 Si 4...

Page 26: ......

Reviews: