FEATURES

.

Front panel indicator lights

.

Field selectable Priority

.

Priority timer for protection of a priority zone malfunction 

and prevention of freeze-ups in the heating zones 

.

Unlimited zone expansion

.

Isolated End Switch and Priority End Switch

.

Three-minute End Switch delay timer for two wire type 

zone valve applications. Circulator will start only after 
the zone valve is fully opened.

.

DIP switch for easy setup of two wire type zone valve 

applications.  No  need  to  hook  up  wire  jumper  on  the 
third and fourth terminals on each zone

.

Works with two, three or four wire type zone valves and 

thermostats

.

Compact and modern design

.

Fuse protection

.

Simplified wiring

.

Contractor friendly PCB layout

.

Easy-Connect Screwless Terminals

.

24VAC  transformer  output  with  common  terminal 

provides compatibility with electronic thermostats

.

Universal thermostat compatibility

.

 

Pre-wired terminals for circulator

.

 

SPDT  Priority  zone  1  relay  switch  (N/O  Com  N/C).   
Capable of prioritizing DHW pump in a 2-pump system

.

 

50VA replaceable transformer

.

100% Factory Tested

.

RoHS compliance & Environmental Friendly - Do Not 

Contain hazardous substances (heavy metals such as 
lead, mercury, cadmium etc).

.

Extended three year warranty

APPLICATION

The 

 series multi-zone zone valve controller is 

i

-Link

operated by low voltage thermostats or any other low 
voltage controllers having an SPST switching action. 
The

 

controller provides intermediate switching 

i

-Link 

to permit up to six zone valves and a boiler operating 
control in a multi-zone hydronic heating system. 

Intelligent  Linking  System  (

allows  unlimited 

i

-Link)

zone  expansion  with  additional 

controllers. 

i

-Link 

Field selectable priority with protection timer prevents 
freeze-ups in the event of a priority zone failure. The 
three-minute  delay  timer  let  the  two  wire  type  zone 
valve fully open before turning on the circulator. 

The panel  provides EZ screwless terminal blocks for 
connections to the thermostats and zone valves. LED 
indicators on the front panel provides functional status 
and easy troubleshooting.

SPECIFICATIONS

Model:  

 

SZ-V4   4 Zone Valve Control

 

 

SZ-V6   6 Zone Valve Control

Power Supply:    

120VAC, 50/60Hz

Transformer: 

 

 50VA

Dimensions:  

 

11.25”(W) x 6.5”(H) x 3”(D)

Electrical Switch Rating:  

10 A 1/3 HP @ 120VAC

Thermostat Anticipator Setting:   0.18 A
Shipping Weight:     

4.5 lbs.

 

 

 

CAUTION!

1.  Improper  installation  and  operation  of  this  control  could  result 

damage to the equipment and possibly even personal injury. All 
wiring  must  comply  with  national  and  local  electrical  codes, 
ordinances, and regulations. Use Copper wires only. 120 VAC 
wiring must have a minimum temperature rating of 75 C. 12-22 
gauge wire is recommended for thermostat  and 24 VAC source 
connections.  12-18  gauge  wire  is  recommended  for  120  VAC 
connections.
Never  connect  the  load  terminals  to  a  load  that  takes  more 
current  than  the  amount  listed  for  the  relay  in  the  electrical 
ratings. 

2.  To  prevent  electrical  shock  hazard,  disconnect  power  supply 

before installing.

3. Azel Technologies is not liable for an special, incidental, indirect 

or consequential damages resulting from the use of its products.

4. This literature is provided for informational purposes only.

OPERATION

When  any  zone  (thermostat)  calls  for  heat,  the  corresponding 
yellow light turns on and zone valve is energized. When zone valve 
is fully opened, the red light turns on and End Switches (X-X) is 
closed (to start boiler) while 120VAC power is supplied to start the 
circulator through “CIRC” terminals. When zone 1 calls for heat, two 
additional End Switches (Zone 1/NC COM NO and X1-X1) are also 
energized. 

DOMESTIC HOT WATER PRIORITY

 

OPERATION

When zone 1 priority switch is set to 

ON

, zone 1(domestic hot water 

zone) has priority control over zone 2 to 6(heating zones). If zone 1 
is  calling  for  heat,  zone  valves  2  to  6  are  disabled  until  zone  1 
domestic hot water demand is satisfied. 

When zone 1 priority switch is set to 

OFF

(factory setting)

,

 all zones 

operate independently of each other.

When  zone  1  priority  switch  is  set  to 

TIMER

(Priority  Protection 

Timer mode), if the priority zone calls for domestic hot water for 
more than one hour(eg. In case of a priority zone failure such as a 
faulty  indirect  water  heater  controller  keeps  calling  for  heat  or 
leaking situation), all the heating zones (2 to 6) are released from 
locking out and they are returned to normal operation. This features 
helps prevent freeze-ups in the event of zone 1 failure. Once the 
priority zone 1 is satisfied, the priority timer is reset to allow priority 
for another one hour.

Note: It is important to set the slide switch before turning on the 

power.