Installing Aluminium Posts
Install Stair End Posts
(if applicable)
• Temporarily install end stair
post so balustrade centerline
aligns with top stair posts
installed in Step 1 (if applicable).
Recommended post installation
locations are shown.
(Dia. #5)
Confirm with local code officials
before installing stair balustrade
sections or stair balustrade posts
to ensure compliance with local
code requirements.
Install End Posts
(if applicable)
Install posts at all end locations with
maximum gap between post and wall
to be less than a 100mm opening
(Dia. #6)
Install 90-degree Corner
Posts
Position post on same 75mm
centerline (typical) and temporarily
fasten using a single fastener through
base plate mounting hole.
(Dia. #7)
3
4
5
Dia. #5
Dia. #6
DECK
EDGE
TOP VIEW
LOCATE
90° CORNER
POST
DECK
EDGE
Dia. #7
Important Note:
75mm x 75mm posts are required at all
transitions. 50mm x 50mm posts may
not be used to start/end a run or to
form a corner.
3B
DECK
SURFACE
STAIR DOWN
75mm TOP
STAIR POST
TEMPORARILY INSTALL
75mm BOTTOM STAIR
END POST ALIGNED
WITH TOP STAIR END
POST (REFER TO STAIR
INSTRUCTIONS)
75mm
TYPICAL
75mm
CENTERLINE
TYPICAL
LOCATE END
POST
LESS THAN 100mm
OPENING
BUILDING WALL
75mm
CENTERLINE
TYPICAL
75mm
CENTERLINE
TYPICAL