
8
Secure the unattached end of the sensor cable before
descending into the manhole. Choose proper installation
configuration and location above and adjacent to the water
stream, taking into account cable length.
Drill a set of holes for each of the two (2) U-clamps leaving
approximately 4 – 10 inches of vertical spacing between the
clamps with horizontal spacing matching the width of the
U-clamp holes.
Insert anchors into each of the four (4) holes for the
U-clamps.
4 – 10 in.
4
Match
U-clamp
spacing
Summary of Contents for Wavelet Wastewater Quality Kit
Page 1: ...QUICK START GUIDE WAVELET WASTEWATER QUALITY KIT May 2016 V0 3 AYYEKA ...
Page 5: ...4 SCHEMATIC PVC Pipe Wavelet Manhole Cover Sensor Cable Wastewater Quality Sensor ...
Page 16: ...15 YOUR WAVELET WASTEWATER QUALITY KIT IS NOW SUCCESSFULLY INSTALLED ...
Page 18: ...www ayyeka com support ayyeka com 1 310 876 8040 QUESTIONS ...