Hardware Operation Manual
25
1: Removing the controller module from Raid system.
2: Open the cover of controller module .
3. Insert a memory module into the memory socket .
4.Close the cover of controller module .
Before starting any kind of hardware installation, please ensure that all powe r
switches have been turned off and all power cords disconnected to prevent
personal injury and damage to the hardware
Use screws provided with RAID system only. Longer or shorter screws may
cause electric shorting or un -proper installed.
Static electricity can damage electronic components. To guard against such
damage:
Work in a static-free environment
Wear a grounded anti -static wrist strap
Store uninstalled components in anti -static bags
Handle PCBs by their edges and a void touching chips and connectors.
Summary of Contents for YB-12S3EF4
Page 1: ...Yotta B SAS SATA Series RAID Subsystem Hardware Installation Guide Ver 1 0...
Page 2: ......
Page 12: ...Hardware Operation Manual 10 YB 16S3EF4 YB 16S3ES3 YB 12S3EF4 YB 12S3ES3...
Page 14: ...Hardware Operation Manual 12 Rear View YB 24S3EF4 YB 24S3ES3...
Page 16: ...Hardware Operation Manual 14 YB 16S3EF4 YB 16S3ES3...
Page 18: ...Hardware Operation Manual 16 YB 12S3EF4 YB 12S3ES3...