4
S19314
Installation
8/5/2015
Bradley •
215-1684 Rev. P; ECN 15-05-019
Supplies Required:
• (3)
3
⁄
8
" floor anchors and bolts
• Teflon tape and pipe sealant
• 30 PSI (2 .0 bar) min/90 PSI (6 .1 bar) max flow pressure
• 125 PSI (8 .6 bar) max static pressure
• Piping to 1¼" NPT (BSPP) water supply inlet (30–90 psi [2 .0-6 .1 bar])
• Piping to 1¼" NPT drain outlet on unit (if included with unit)
• Adequate supply pipe supports
• Provisions to dispose of shower waste water (minimum 30 gallons [115 liters]) should be made (minimum 4" [102mm] drain .
• OPTIONAL: sign-mounting hardware
• DVGW certified teflon tape (for DVGW certified models only)
Local codes may require the installation of a backflow prevention valve to complete proper installation. Compliance with
local codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly.
Backflow prevention valves are not included with the fixture and may be supplied by the contractor or purchased from
Bradley Corporation.