
Safety regulations
SKM 2-00
© AXING AG – state of the art: September 2016 – Reserving change in design and type
Page 2
Contents
1
Safety regulations ....................................................................................................... 2
2
Common ...................................................................................................................... 3
2.1
Scope of delivery .......................................................................................................... 3
2.2
Description .................................................................................................................... 3
2.3
Display elements and connections ............................................................................... 4
3
Installation and connection ....................................................................................... 5
3.1
Installation and connection in a headend base unit ...................................................... 5
3.2
Single operation mode of SKM 2-00 ............................................................................. 6
4
Programming .............................................................................................................. 7
4.1
Deployment ................................................................................................................... 8
4.1.1 Selecting wire (left or right) ........................................................................................... 8
4.1.2 Setting output channel .................................................................................................. 8
4.1.3 Setting TV standard ...................................................................................................... 8
4.1.4 Vernier adjustment of the output frequency .................................................................. 8
4.1.5 Setting output level ....................................................................................................... 8
4.1.6 Setting audio mode ....................................................................................................... 8
4.1.7 Finishing the programming ........................................................................................... 8
5
Technical specifications ............................................................................................ 9
1
Safety regulations
• Assembly, installation and service must be carried out by authorized and skilled electricians.
• Switch off facility operating voltage or pull out mains plug before starting assembly or service
work.
• Facility assembly:
In dust-free, dry environment, protected against humidity, vapors, splash water and moisture.
In a location protected against solar radiation. Not within close distance of heat sources. In
ambient temperature of <50°C.
• Ensure sufficient ventilation of the device. Do not cover the ventilation slots! - Avoid short
circuits!
• Damages arising from incorrect connection and/or improper operation are excluded from any
liability.
• Please observe all relevant standards, regulations and guidelines regarding installation and
operation of antenna facilities.
• Ground SAT earth stations using equipotential bonding rails according to EN 50083-1,
EN 60728-11:2010.
• Do not carry out any installation and service work during thunderstorms.
Summary of Contents for SKM 2-00
Page 1: ...BETRIEBSANLEITUNG Twin Modulatorkassette SKM 2 00...
Page 10: ...2018 09 14 AXING AG Schweiz Konstrukions Typen nderung Irrt mer und Druckfehler vorbehalten 17...
Page 11: ...OPERATION MANUAL Twin Modulator Module SKM 2 00...
Page 20: ...2018 09 14 AXING AG Schweiz Konstrukions Typen nderung Irrt mer und Druckfehler vorbehalten 17...