 Installation and Start-Up Instructions 

 
1.  Uncrate, remove from pallet, and check for damage that may have occurred during shipping. 

 

2.  Locate Chlorination System in adequately ventilated area and on level ground.  If system is in area 
subject to standing water, then system should be raised above standing water.  Adjust leveling feet as 
necessary. 

 

3.  All systems are tested in full operation at the factory; however fittings may loosen during shipping 
and  some  parts  are  shipped  loose.   

Before  Installing  System, 

hand  tighten  all  fittings  on  valves, 

check valves, and unions. 

 

4.    Use  1-

1/2”  minimum  piping  on  the  chlorinator  inlet  and  outlet  piping  to  ensure  ample  supply  of 

water.  Use isolation valves at main system connections.  When connecting outlet piping cement the 
check valve and discharge gate valve, in that order, from the discharge of the pump.   

 

5.  Connect the power supply to the disconnect switch as shown on the electrical schematic. 
 
6.      Connect  the  110v  control  signal  (if  used)  to  terminals  #5  and  #6,  or  the  Dry  Contact  signal  to 
terminals #7 and #8.. 

  

7.   Once the power and water input  and output  connections are in  place, open isolation valves and 
check for leaks.  

 

8.  Place the H/O/A switch to HAND.  Solenoid valve will open feeding water to the system. 

 

9.  Open the pump prime line valve to allow water to prime the pump.   

  

10.    Once  the  water  level  in  the  tank  clears  the  low  level  switch,  the pump  will  begin  to run.    Open 
discharge valve slightly to allow flow out of the system, and close the pump prime line valve.  Water 
will be flowing into the tank with the pump discharging water to the system. 

 

11.    Switch  system  to  AUTO  and  operate  system  using  the  controller  (if  used).    If  no  controller  is 
used, the system will not operate in AUTO -

 

leave the system in the HAND mode. 

 

12.  Open the inlet valve and set the flow to the desired flow rate according to the delivery charts on 
the next several pages. 

 

13. Slowly, and in small increments, continue to open the discharge valve, and adjust inlet valve as 
necessary to maintain the desired inlet flow.  

 

14.  Make incremental changes to the discharge valve until the tank water level drops and stabilizes     
approximately ½ to ¾ tank level.  On most systems this will mean the discharge valve is fully open. 

 

15.

  

Turn the system OFF and ON several times, allowing it to operate for several minutes each time.  

Check all connections for leaks, making sure the delivery pump suction always remains covered with 
water.

 

 

16.  To  begin  chlorinating,  remove  the  chlorinator  lid  and  fill  the  Chlorinator  with  Axiall 

Accu-Tab

®

  SI 

tablets. 