
3
STEP 2:
The Top Bar (TB) must be installed first. Mount Provided Z-Brackets to surface, and insert TB into brackets.
The C-Channel must be close to the wall. Before installing the TB you must make sure that there is enough space
below to install PB. Please keep in mind there are no pre-drilled holes for Z-Brackets and you'll need to use the
provided self tapping screws to secure the top bar to the bracket wherever you need a bracket. (please see the
chart below for the height measurements)
STEP 3:
Install Santa Fe Bars (SFB) on to Front Bar (TB) Velcro will face forward on the front bar. For Awnings larger
than 5’ you will need to install Black Projection Bar (BP). There will be no pre-drilled holes for the (BP) and you'll
need to use self tapping screws to secure them to the back end of the front bar wherever space is available.
Frame 2’-4’
Frame 5’-7’