![AWIN AW-EB920 Operation Manual Download Page 9](http://html1.mh-extra.com/html/awin/aw-eb920/aw-eb920_operation-manual_3035475009.webp)
A. Power Assisted Mode (PEDELEC)
B. 100% Electric Mode (E-Bike)
Installation
Turn on the power switch, and hold on the lever for more than 6 seconds
, then sit on the seat and stamp the foot pedals to ride the electric bike in
Power Assisted Mode.
Turn on the power switch, and hold on the lever for more than 6 seconds
, then sit on the seat and turn the speed control throttle to ridethe electric
bike in
Electric Mode .
100%
3.Trial Riding
3.Trial Riding
FULL
HALF
EMPTY
Notes of installing the battery pack
1
2. You must plug the battery pack socket into the connector of the controller b
3. Please keep the key of padlock carefully for fear of your inconvenient.
4. Before you want to take out the battery pack,p
. When you put the battery pack into rear carrier, please keep the pack holder upside,
and make sure whether the position of battery pack is correct or not.
efore
turning on the power switch.
eel off the connection between the
battery pack and controller.
-8-
AWIN TECHNOLOGY CORP.