AWID LR-3000 Quick Start Manual Download Page 4

UHF Long-Range Readers – Preparing for Install Support 

Version 1 

Page 4 of 4 

 

I. 

CHECK LIST

 

___  1.  Assure that the plan meets the 

“Guidelines”

 for an effective and satisfying installation. 

___  2.  Be familiar with the 

“Good Practices”

 that lead to good results. 

___  3.  Collect the 

“Tools and Supplies”

 that will be needed in shop-testing and for the installation at the site. 

___  4.  Be 

familiar with the site

 – where each part of the system will be located, and how the parts will work together. 

___  5. 

Test AWID’s products

 at you shop, to know how all items work and how they will be installed at the site. 

___  6.  Contact AWID’s 

Technical Support

 with questions. 

 

J. 

AWID’S SUPPORT PEOPLE 

Sales 

 

Please contact your AWID supplier or the Regional Sales Manager. 

Customer Support 

Please contact AWID’s corporate offices – 408-825-1100, option 3. 

Technical Support 

Please contact AWID’s corporate offices – 408-825-1100, option 1. 

 

K. 

HOOK-UP DIAGRAMS 

 

                      Figure 1.  Test Unit Wiring. 

                Figure 2.  Installation Wiring  (Wiegand). 

 

 

     Figure 3.  Effective RF Field for UHF Long-Range Readers. 

 

Reviews: