Install the injector manifold after the ozone booster pump, making sure to note the correct flow
direction of the injector manifold. The location of the injector manifold and booster pump is
dictated by the mechanical blueprints. The check valve assembly is strapped to the injector
manifold. Unstrap and install the check valve assembly to the injector.
Tubing Installation
Install the check valve assembly into the injector. Connect the 1/4” Teflon tubing from the OZONE
OUT fining on the bottom of the ozone generator to the check valve assembly on the injector.
Secure by tightening the fitting around the ¼”
Teflon tubing after insertion.
Summary of Contents for Corona Discharge CD10
Page 1: ...INSTALLATION AND OWNER S MANUAL Corona Discharge CD10 AD Ozone generator ...
Page 5: ......
Page 7: ......
Page 11: ...SIDE STREAM OZONE INJECTION SYSTEM Typical Commercial Ozone Schematic with Contact Column ...
Page 13: ......
Page 16: ......
Page 17: ......
Page 20: ......
Page 23: ...CD10 AD MAINTENANCE TROUBLE SHOOTING MANUAL PARTS WARRANTY ...
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......