background image

ORCA Floor Mount Van

ity

Installation Guide

1

Rubber 

Mallet

Silicone

Pencil

Screwdriver

SAFETY  INFORMATION 

•  Read all instructions before starting installation.

• 

We recommend that a qualified tradesperson install this vanity. 

• 

This installation is a two-person job due to the weight and size of the product.

• 

Check the product immediately upon receipt for any missing packs/parts or damage during transit.  If any damage 

or faults are found, DO NOT install the product - contact our customer service team at Award Brands via toll-free 

phone no. 1800 354 435 (outside Victoria) or (03) 9871 8444 inside Victoria.  Damage reported after installation 

will void the warranty of this product.

NOTE: This vanity unit is to be mounted on a secure surface. Award Brands shall not accept responsibility for any 

damage caused by improper installation.

• 

Depending on the installation, you may need to drill or cut out holes on the back of the vanity to suit your pipe 

work, it is recommended that you should measure your pipe work and mark the measurements to the back of the 

vanity first, double check to ensure the measurements and markings are correct before drilling or cutting out holes 

at the back of the vanity unit.

• 

 Standard pop-up waste is provided with the vanity top.

• 

To easily access back of cabinet when installing plumbing pipework, remove drawers as described on Page 3.

• 

Due to transit, some adjustment to hardware parts maybe required to correct any gaps or alignment issues. (follow 

the instructions on page 3).

•  Do not stand or sit on this vanity at any time.

October 2015

TOOLS REQUIRED FOR INSTALLATION 

Cloth

Drill

Measuring Tape

Methylated 

Spirits

Spirit Level

SIZES 900mm & 1200mm

Summary of Contents for ORCA

Page 1: ... Award Brands shall not accept responsibility for any damage caused by improper installation Depending on the installation you may need to drill or cut out holes on the back of the vanity to suit your pipe work it is recommended that you should measure your pipe work and mark the measurements to the back of the vanity first double check to ensure the measurements and markings are correct before dr...

Page 2: ...t complete all pipe work and connect water supply lines 5 Allow 24 hours for silicone to cure before using this vanity INSTALLATION STEPS Dia A Dia B Dia C CARE INSTRUCTIONS The product you have purchased has been designed to provide many years of dependable service however the finish requires care and maintenance in order to delay the wear that will eventually occur over time It is recommended to...

Page 3: ...ing that the locating holes in the rear of the drawer engage with the lugs on the rear of the runners Lower the front of drawer onto the front locating lugs Replace the retaining screws Open the drawer and remove the screw in the runner from both sides Hold the drawer up at a slight angle and take it out slowly ...

Page 4: ...s extended to the purchaser only and is not transferable For warranty service please contact with our customer service team at Award Brands via toll free phone no 1800 354 435 outside Victoria or 03 9871 8444 inside Victoria Please prepare and provide us with the following items when you claim a warranty service for this product The original sales receipt as proof of purchase including the date of...

Reviews: