compliance. Normally, such responsibilities with lie with the representative, unless other
arrangements (under Article 9) have been made.
Requirements for WEEE compliance may include registration of products with local
governments, reporting of recycling activities to local governments, and financing of
recycling activities.
FIRMWARE LICENSING
Instruments with firmware versions 5.00 or higher use open-source software internally.
Some of this software requires that the source code be made available to the user as a
condition of its licensing. This source code is available upon request (contact
[email protected]).
Earlier firmware versions do not contain any open source software.
10
Summary of Contents for AVR-G5-B
Page 34: ...PCB 158R4 LOW VOLTAGE POWER SUPPLY...
Page 35: ...PCB 235B HIGH VOLTAGE POWER SUPPLY...
Page 37: ...PCB 228B OP AMP...
Page 38: ...PCB 287A TTL BUFFER...
Page 43: ...PERFORMANCE CHECK SHEET 43...