compliance. Normally, such responsibilities with lie with the representative, unless other
arrangements (under Article 9) have been made.
Requirements for WEEE compliance may include registration of products with local
governments, reporting of recycling activities to local governments, and financing of
recycling activities.
FIRMWARE LICENSING
Instruments with firmware versions 5.00 or higher use open-source software internally.
Some of this software requires that the source code be made available to the user as a
condition of its licensing. This source code is available upon request (contact
[email protected]).
Earlier firmware versions do not contain any open source software.
10
Summary of Contents for AVR-E5-B
Page 35: ...PCB 158R2 LOW VOLTAGE POWER SUPPLY...
Page 36: ...PCB 235B HIGH VOLTAGE DC POWER SUPPLY...
Page 37: ...PCB 216E PRF PW TWEAKS...
Page 42: ...PERFORMANCE CHECKSHEET 42...