7.2.3 Cabling Requirements
The installation of the AV-OL-KT-I1 Obstruction Lighting Kit requires the following cables (if
optional cable kit is not purchased):
7.2.4 Factory Configuration
Dual light fixture with both light heads preassembled.
7.2.5 Installation Recommendation
Note:
The sequence of steps can be adjusted for site requirements.
1. Wire and test the system on ground level.
Conduct a basic functional check to ensure that the lights turn on as expected. Refer to
Section
7.3 Testing Procedure.
Reference Point
Cable
Dual Obstruction Light-Control Unit
•
Power & Data Cable: 2.5mm
2
, 3 Conductor