background image

20

Replacing the Battery

The AV-OL-310 has an internal battery compartment, which provides the user with the 

ability to change the battery after years of operation.
1. 

Remove the four socket-head screws on the top lens assembly and separate the AV-

OL-310 lens assembly from the body/base section. 

2.  Remove 2 x M2 SHCS & washers from the top battery bracket.
3.  Separate the light head at the connectors.
4.  Lift the upper battery bracket out of the AV-OL-310. 
5.  Disconnect the old battery
6.  Remove the old battery from the chassis. 
7.  Discard old battery in a safe manner. 
8.  Reconnect the new battery. 
9.  Place battery back inside light body, and position the upper battery bracket in the top 

of the chassis.

10.  Secure using 2 x M4 Cap screws & washers. 
11.  Feed all wiring back inside light body, and make sure the O-ring is properly placed at 

the top of the light body.

12.  Please realign bidirectional indicators on the base with the light head to ensure correct 

alignment of the light output on the runway.

13.  Place the top lens assembly back onto the light body and replace 4 socket head 

screws. Half tighten all 4 socket head screws, and then fully tighten each socket head 

screw to ensure an even seal.

• 

It is recommended that the bolts for holding the light heads to the Solar Base units 

have a torque setting applied of 3Nm for a satisfactory seal. Applying a higher Torque 

setting is not recommended and may void warranty. If in doubt, please contact your 

local Avlite representative.

14.  To test place dark cover (towel or jacket) on top of light to activate sensor, light will 

come on.

Care must be taken to observe the polarity of each wire before they are connected. 

To ensure waterproofing of the unit, make sure that there is an even seal. 

Safe Battery Handling

Charging and Discharging
•   Always ensure batteries are fully charged when installing new lights. The light will be 

dispatched from the Avlite factory fully charged. However if time has elapsed between 

dispatch and installation, battery voltage must be checked. 

•   Never short-circuit or reverse polarity of a battery, damage to the battery and device 

may occur, and there is a risk of fire. 

•   Do not use different types of batteries in the same battery assembly. Sealed lead acid 

and NIMH do not mix.

•   If the battery has been deep-discharged, a prolonged charging time is required to bring 

the battery back to full capacity.

Summary of Contents for AV-OL-310 Base Compact

Page 1: ...V1 0 INSTALLATION SERVICE MANUAL AV OL 310 Solar Low Intensity Obstruction Light FAA L 810 ICAO Low Intensity Type A and B ILAB...

Page 2: ...2 Version No Description Date Reviewed Approved Design 1 0 AV OL 310 Manual Launch December 2019 P Naidu W Evans M Sugars...

Page 3: ...V OL 310 Data Sheet 9 5 0 Safety Information 11 6 0 Operation and Setup 12 6 1 AV OL 310 12 6 1 1 GPS Syncronisation 15 6 1 2 Operation Mode and Preset Configurations 16 7 0 Unpacking Installation and...

Page 4: ...aken to ensure your product gives years of trouble free service As a commitment to producing the highest quality products for our customers Avlite has been independently certified as complying with th...

Page 5: ...dvancements in LED Light Emitting Diode technology as a light source The major advantage of LED s over traditional light sources is well established in that they typically have an operational life in...

Page 6: ...base and an aluminium internal chassis The solar chassis is available in three chassis heights Compact Standard and Extended all of which come with upgraded solar panels and a maximum power point trac...

Page 7: ...60 18 11 407 16 01 504 19 83 564 22 19 100 3 93 234 9 20 168 6 61 200 7 87 120 Base Compact Standard Extended 303 11 93 400 15 75 460 18 11 407 16 01 504 19 83 564 22 19 100 3 93 234 9 20 168 6 61 200...

Page 8: ...a GSM or SATCOM Operators can remotely monitor the status of their installation from a compatible device The system can also be configured to send out SMS text messages or e mail alerts to designated...

Page 9: ...to 55 C Solar Characteristics Solar Module Monocrystalline Output watt 20 4 x 5watt 28 4 x 7watt 33 6 4 x 8 4watt Charging Regulation MPPT Power Supply Battery Type SLA Sealed Lead Acid Battery Capac...

Page 10: ...ensity Obstruction Light Qualified by Intertek DGAC L 810 Low Intensity Obstruction Light Qualified by Intertek Waterproof IP68 Intellectual Property Trademarks AVLITE is a registered trademark of Avl...

Page 11: ...ally aligned to guarantee the required beam pattern of the obstruction light Make sure any nearby obstacles do not impede the lights beam pattern When installing comply with all local electrical code...

Page 12: ...ch The lights can be fitted with an external ON OFF switch below the solar panel at the base of the unit The ON OFF switch may be useful if the unit is only required for short periods i e it is being...

Page 13: ...te com 13 Item Description Quantity 1 AV OL 310 Composite Base 1 2 AV OL 310 Lens Assembly 1 3 Battery 12V 1 4 Battery Clamp 1 5 Washer M4 2 6 M2 Cap Screw 2 7 O Ring ID 145 x 4 0 1 8 Socket Head Scre...

Page 14: ...tandby Mode Flashing ON 0 15 seconds OFF 0 15 seconds Normal OFF Light is activating and will turn on after detecting 30 seconds of continuous darkness Flashing 2 x quick flashes every 2 seconds Heart...

Page 15: ...thm based on the highly accurate time base and time data received from the satellites The satellite data is provided from a number of earth stations using atomic clocks as the time base Continuous sel...

Page 16: ...hanging the INTENSITY DIP switch Please refer to table below for DIP switch settings for both the FAA L 810 and ICAO Type A and B compliant fixtures Position 2 Position 1 Light Intensity FAA L 810 ICA...

Page 17: ...the OFF position when power is connected DO NOT connect power to the PCU when the control panel power switch is toggled to the PWR position This may result in damage to the power sources WARNING DO NO...

Page 18: ...the top lens assembly back onto the light body and replace the 4 x socket head screws Avlite recommends that the Light Head be tightened to the Solar Chassis Base using the general purpose Grip Tool...

Page 19: ...ttle and replace if necessary The O ring should be a rubber texture to ensure a complete and even seal Service Tools 1 x M2 Allen Key 1 x M5 Allen Key 1 x 13mm Combination Wrench 1 x M8 Allen Key 1 x...

Page 20: ...ws Half tighten all 4 socket head screws and then fully tighten each socket head screw to ensure an even seal It is recommended that the bolts for holding the light heads to the Solar Base units have...

Page 21: ...show light output This colour indication should be aligned with the colour indication on the solar unit to ensure correct alignment 5 Fit the 4 x M6 x 20 SHCS 6 Tighten the SHCS evenly and firmly It i...

Page 22: ...tery voltage is above 12volts Check the Status LED s on the base of the PCB to determine what type of fault the light is activating Light will not operate for the entire night Expose light to direct s...

Page 23: ...AV OL 310 Solar Low Intensity Obstruction Light Installation Service Manual Latest products and information available at www avlite com 23 Notes...

Page 24: ...ailable Avlite Systems Australia 61 0 3 5977 6128 Avlite Asia Pte Ltd Singapore 65 6908 2917 Avlite USA LLC USA 1 603 737 1311 We believe technology improves navigationTM avlite com info avlite com Ai...

Reviews: