Avlite AV-BSBL Quick Start Manual Download Page 1

For the full manual, visit the link below:

avlite.com/product/barrette-steady-burning-light-av-bsbl/

Quick Start Guide

AV-BSBL

Thank you for purchasing this product.

 This guide will 

provide you with a brief summary of the steps involved in 

deploying the Folding Steady Burning Barrette with tie-down 

installation.

Your system will consist of:

 1 x Folding Steady Burning Barrette, 2 x Stanchions (or Support Pole),  

2 x 2 in. Stainless Couplings, 2 x Mounting Caps, 8 x Ground Stakes, 4 x 12 ft. Line (Single Loop),  

4 x 14 in. Line (Double Loop), 4 x Cam Clips

Required Tools:

 Mallet (User Supplied)

Step 1: Gather All Components

Lay all the parts on the ground in preparation for 

assembly.

Step 2: Open Barrette Latch

a. 

Lift the handle of the butterfly latch to unlock. 

b.  Unfold the Barrette.

Step 3: Straighten the Barrette

a.  Straighten the barrette until it is fully extended.

b.  Secure the two latches.

Folding Barrette

U-Bolt

Ground Stake

Mounting Cap

Double Loop Line  

with Cam Clip

Single  

Loop Line

Step 4: Install Mounting Cap

a. 

Slide two U-bolts onto barrette between the first 

and second light head.

b.  Flip barrette over.

c. 

With flat side down, align the mounting cap 

holes with the U-bolt. Ensure the arrow on 

mounting cap is pointing towards the lights.

d. 

Place (4) flat washers over U-bolts and thread (4) 

hex nuts until fingertight.

e.  Thread coupling onto mounting cap. 

f.  Repeat on other end.

U-Bolt

Mounting Cap

Coupling

Summary of Contents for AV-BSBL

Page 1: ...omponents Lay all the parts on the ground in preparation for assembly Step 2 Open Barrette Latch a Lift the handle of the butterfly latch to unlock b Unfold the Barrette Step 3 Straighten the Barrette a Straighten the barrette until it is fully extended b Secure the two latches Folding Barrette U Bolt Ground Stake Mounting Cap Double Loop Line with Cam Clip Single Loop Line Step 4 Install Mounting...

Page 2: ... 8 Set Up Tie Down Stakes a Insert tie down stake into the ground approximately 6 7 feet from one of the stanchions on the front side of the Barrette b Use a mallet to pound a stake securely into the ground c Repeat steps from the back side of the Barrette d Repeat steps on the opposite side Threaded Flange Frangible Coupling Support Leg Step 7 Set Up Barrette a Flip entire Barrette assembly over ...

Page 3: ...around top of the tie down stake c Pull the line until the loop is taut around stake d Clip the carabiner of the cam clip to the other end of the loop Step 11 Feed the Line into Cam Clip a Pull the line from the stanchion to the ground stake located directly in front of the stanchion b Take the cam clip from the ground stake tie down assembly and feed the tail end of the line into the cam locking ...

Page 4: ...or optional solar panel installation instructions b Connect the Solar Panel cables to the Solar Panel inputs on the Battery Box Step 13 Connect to Battery Box a Connect Barrette PCU power cables to the Battery Box b Refer to MALSR Cable Layout diagram in the Approach Lighting Installation Service Manual for direction on which barrettes connect to the Battery Box and which barrettes connect to the ...

Reviews: