![AVK 756 Series Operation & Maintenance Instructions Manual Download Page 3](http://html.mh-extra.com/html/avk/756-series/756-series_operation-and-maintenance-instructions-manual_3032484003.webp)
2. TRANSPORT AND STORAGE
2.1 TRANSPORT
During transport to the installation site, the valve must be packed in a safe and stable packing material suitable for the
specific valve size. The valve must be completely protected against any kind of atmospheric influence and external
damage. Valves that are shipped under specific climatic conditions (e.g. overseas transport) must be specially
protected.
The valve must be placed on one of its flanges or alternatively on the flange flat base during transport.
Make sure that the valve is placed in horizontal position during the entire lifting procedure.
The general regulations relating to use of lifting devices must be met at all times.
Transport position - on flange
Transport position - on flat base
Lifting eyes of valves up to DN 600
Lifting holes of valves from DN 700
OPERATION & MAINTENANCE INSTRUCTIONS - ORIGINAL VERSION
AVK DOUBLE ECCENTRIC BUTTERFLY VALVES
SERIES 756
Page 3/13