![AVIVA 1148510 Manual Download Page 4](http://html.mh-extra.com/html/aviva/1148510/1148510_manual_3032460004.webp)
1
2
PUSH & ROTATE
POUSSER ET TOU
DRÜCKEN UN
PRESIONAR Y GIRAR
3
OPEN VALVE CAP
OUVRIR LE COUVERCLE DE LA VALVE
ÖFFNEN DER VENTILKAPPE
ABRIR LA TAPA DE LA VALVULA
www.avivasports.com
RNER
D DREHEN
ONAR Y
TE
UR
N UND DREHEN
ESIONAR Y GIRAR
ORBIT
3M, 5M & 7M
OR/OU/ODER/O
RAPID INFLATION
HAKLEY ROBERTS
Inflation
Gonflage
Aufblasen
Inflado
INFLATE WITH PUMP Nr.1, Nr.2, Nr. 3 or Nr.4/
GONFLER A L'AIDE DE LA POMPE Nr.1, Nr.2, Nr. 3 ou Nr.4
MIT HILFE VON PUMPE Nr. 1, Nr. 2, Nr. 3 oder Nr. 4 AUFBLASEN
INFLAR CON LA BOMBA Nr.1, Nr.2, Nr. 3 o Nr.4
Set up/Aufbau/Montage/Montaje
TRAMPOLINE
Summary of Contents for 1148510
Page 1: ... E IT S JDUR SPRCE mRltE IT Fun Art 1148510 1148523 1148536 MANUAL ...
Page 7: ...Assembling the frame 1 2 3 ...
Page 8: ...Attaching frame to Orbit tube 2 3 1 ...
Page 10: ...M A T B E D MAT BED Attaching Safety Pad to Orbit frame 1 2 ...
Page 11: ...M A T B E D MAT BED Final Assembly ...
Page 12: ...Set up Aufbau Montage Montaje Attaching ladder 4 3 m Orbit 6 7 m Orbit 5 5 m Orbit ...