![Avigilon NVR5-10GBASET-A2 Installation Manual Download Page 10](http://html1.mh-extra.com/html/avigilon/nvr5-10gbaset-a2/nvr5-10gbaset-a2_installation-manual_3031671010.webp)
Reattaching the Cover
When all the components of the kit have been installed:
1. Ensure all expansion card latches are closed and there are filler covers for all empty slots.
2. Reinstall the top of the cooling shroud.
3. Close and lock the NVR5 cover.
4. If the NVR5 was rack mounted and removed to install the kit, remount it into the rack.
5. Reconnect all the peripherals and cables.
Important:
Ensure that both of the power supplies are connected to main power. The
upgraded NVR5 requires both power supplies to properly function.
6. Power on the NVR5.
Reattaching the Cover
10