Reattaching the Cover
When all the components of the kit have been installed:
1. Reinstall the top of the cooling shroud:
a. Align the slot on the air shroud with the standoff in the system.
b. Lower the air shroud into the system until it is firmly seated.
2. Close and lock the NVR5 cover.
3. If the NVR5 was rack mounted and removed to install the kit, remount it into the rack.
4. Reconnect all the peripherals and cables.
Important:
Ensure that both of the power supplies are connected to main power. The
upgraded NVR5 requires both power supplies to properly function.
5. Power on the NVR5.
Reattaching the Cover