Checklists
The checklists below identify the tools and equipment required for installation.
Tools Checklist
The following tools are required:
5PPM
3FRVJSFE3FDPNNFOEFE0QUJPOBM
□
Stud finder
Required
□
Cordless drill or large screwdriver
One required - drill is recommended
□
Various drill bits
Required
□
Needle nose pliers
Required
□
Small slotted screwdriver (1/8” or less)
Required
□
Small hammer
Required
□
Wire cutter
Required
□
Wire stripper
Required
□
Laptop
Recommended
□
Multi-meter
Optional
Equipment Checklist
The following equipment is provided:
5PPM
3FRVJSFE3FDPNNFOEFE0QUJPOBM
□
One AC-LSP-4DR-HID-LCK LifeSafety Power four door
HID dual voltage integrated power system (supplied in
a separate shipping box)
Required
□
One Avigilon AC-HID-ACMEC V1000 ACM Embedded
Controller
Required
□
Two AC-HID-VERTX-V100 reader interface modules
Required
□
Four AC-HID-READ-ICLASS-SE-R10-AVG card readers Required
□
100 AC-HID-CARD-ICLASS-SE-3000-AVG contactless
smart card, 2k bit with two application areas
Required
Checklists
21