260-668080-001 Rev 002 March 2013
1
Chapter 5. Eclipse Edge
Commissioning and
Troubleshooting
This
section
section
describes the commissioning process, commissioning tests, and
troubleshooting for an Eclipse Edge installation. Refer to:
• Eclipse Edge Commissioning Process
•
Eclipse Edge Commissioning Tests on page 3
•
Commissioning Records for Edge on page 11
•
Eclipse Edge Troubleshooting on page 13
NOTE:
Commissioning tests and troubleshooting guides are based on those
detailed in Aviat Networks’ Best Practices Guide.
Eclipse Edge Commissioning Process
Commissioning ensures Eclipse Edge:
• Is installed correctly
• Is correctly configured
• Has passed all tests
• Is operating to plan and running alarm and error-free
• Has had all relevant commissioning data recorded
• Is ready for traffic carrying duty
• A recommended Eclipse commissioning form (as an Excel worksheet) is available to
assist compilation of an installation datapack, and capture of as-built data, to result
in a complete node as-built record. Refer to
Commissioning Records for Edge on
A typical commissioning process is summarized in
Summary of Contents for ECLIPSE EDGE
Page 1: ...ECLIPSE EDGE Version 5 USER MANUAL 260 668080 001...
Page 2: ......
Page 3: ...Eclipse Edge Microwave Radio System User Manual Software Version 5 0 March 2013...
Page 14: ...16 Aviat Networks INDEX...
Page 18: ......
Page 26: ...8 Aviat Networks Chapter 1 Health and Safety...
Page 272: ...36 Aviat Networks Chapter 3 Eclipse Edge Installation...
Page 273: ......