RLP Railweight Low-Profile Track Scale Installation and User’s Manual
Installation of the Base Plates
Place the base plate on the grout plate. Use supplied washer plates, lock
washers and bolts to hold the base plate in place,
but do not tightem them
completely at this time
. The base plate will be locked tightly
only after
the
final positioning and alignment of the load cells.
Check for proper orientation so that weighbridge(s) match the grout plates as
shown on the Foundation/General Arrangement drawing. Lower the
weighbridge(s) onto wooden blocks.
Attach load cell support plates to the weighbridge(s) using the supplied
hardware.
Installation of Weighbridge(s)
Installation of Load Cell Support Plate on Single Weighbridge
All wooden blocks must be of
uniform height.