210
9.5 F
EED
UNIT
ALS
20X
256
9.5.3
Pressure roller
Tools:
– Hexagon socket driver SW 2.5, 3, 5
– Hot air blower
– Mounting mandrel (make this yourself to the
specifications in Fig. [283])
[283] Mounting mandrel for friction bearing bushings
Auxiliary materials:
– Loctite 648 adhesive
– Loctite 243 Threadlocker
– Multi-purpose grease
Replacing friction bearings
Fold pressure roller out of working position.
Remove 2 screws [280B], remove the
handhold [280A].
Screw the knurled thumbscrew [281A] all of the way
out and remove the pressure roller along with clam-
ping ring.
Push out the friction bearing bushings [282A].
Push the friction bearing bushings into the pressure
roller with the mounting mandrel.
Thoroughly grease friction bearings. The lubrication
pockets [282arrow] in the friction bearing bushings
must be completely filled with grease.
Install the pressure roller
Clean the threads of the screw joints [280B] atta-
ching the handhold to the pressure roller then screw
screws back in, using Loctite 243.
[280] Removing handhold
[281] Removing pressure roller
[282] Friction bearing bushing with lubrication pockets
B
A
A
A
15
Ø
16
Ø
20
-
0,2
Summary of Contents for ALS 204
Page 1: ...ALS 204 206 256 SERVICE INSTALLATION MANUAL Labeller Edition 8 3 2012 Original version ...
Page 2: ......
Page 223: ......