3.4. Electric installation
ATTENTION: Electric installation work should be carried out by a certified electrician.
- Lead out the power cables to the place of installation of the wall switch and between wall switch and screen
- Screen power line should be fused with 1A fuse.
- Switch off the screen power line during installation work.
- Manual wall steering switch should be installed at the place meeting the following conditions:
a) installation150-180 cm above the floor level,
b) the screen should be visible by the wall switch operator during the screen operation,
c) wall switch operator cannot stay in reach of any of the screen’s moving parts during the screen operation .
d) the wall switch must be visible from the each part of the room irrespective of the screen position.
Rys.8 Instalacja ekranu na suficie - faza 5
Rys.9 Instalacja ekranu na suficie - faza 6
9